ICTSAS304 Provide basic system administration LMS 2

Skills Assessment

{`
  Unit code, name
  ICTSAS307 - Install, configure and secure a small office or home office network (1)
  Qualification/Course code, name
  ICT30118 - Certificate III in Information, Digital Media and Technology (2)
  TAFE NSW
  `}

Assessment instructions

Table 1 Assessment instructions

Assessment details

Instructions

Assessment overview

The objective of this assessment is to assess your skills as would be required to:

· install and configure hardware and software

· configure and test network

· secure network.

Assessment event number

4 of 5

Instructions for this assessment

This is a skills-based assessment and will be assessing you on your ability to demonstrate skills required in the unit.

This assessment is in four parts:

1. Install network

2. Configure network

3. Test network

4. Secure network

This assessment also contains:

· Assessment checklist

Check the Assessment checklist to ensure that you’ve covered all the required tasks.

Submission instructions

When you have completed this assessment, submit it online for marking by your assessor.

Ensure you have typed your name at the bottom of each page of every document you create.

Submit the following files or documents:

· This updated assessment document, including supporting evidence in the form of video recordings and/or screenshots with descriptions. Follow the video recording instructions (pdf) to record and submit your video.

· Completed Packet Tracer file, named PlanetG3_NetSim_PT_yourname.pka
where yourname of your full name.

See below for details of what to submit for each part.

Part 1: Install network

· Step 1.1: Completed Packet Tracer file, named PlanetG3_NetSim_PT_yourname.pka.

· Step 1.3: A video recording of the steps you took to install a network — place recording link in this updated assessment item. Alternatively, paste in your screenshots, with descriptions.

Part 2: Configure network

· Step 2.1: A video recording of steps you tool in configuring the network — place recording link in this updated assessment item. Alternatively, paste in your screenshots, with descriptions.

Part 3: Test network

· This updated assessment item, with the option of also including screenshots.

o Step 3.1: Complete relevant part in this updated assessment item.

o Step 3.2: Troubleshooting log.

o Step 3.3: Results of your connectivity tests.

o Step 3.4: Record of your troubleshooting and configuration actions and results.

o Step 3.5: Results of your intranet access testing.

o Step 3.6: Troubleshooting log.

o Step 3.7: Documentation of your intranet access tests.

o Step 3.7: Troubleshooting log.

Part 4: Secure network

· Complete this updated assessment item — and include links to your video recordings (or screenshots with descriptions).

o Step 4.1: Video recording link

o Step 4.2: Screenshots and description.

o Step 4.3: Complete relevant part in this assessment item.

If you are uploading (submitting) more than one file, zip all files into a single file.

If you create a video or videos follow the Video recording instructions (pdf) to record and submit your video.

It is important that you keep a copy of all electronic and hardcopy assessments submitted to TAFE and complete the assessment declaration when submitting the assessment.

What do I need to do to achieve a satisfactory result?

To achieve a satisfactory result for this assessment all questions must be answered correctly and all items in the Assessment Checklist must be marked Satisfactory.

Assessment conditions

Assessment conditions will replicate the workplace, including noise levels, production flow, interruptions and time variances.

What do I need to provide?

· Computer, internet and login details.

· Word processing software.

· A video recording device, such as a smartphone, or access to a web meeting platform, such as Skype, Microsoft Teams or Zoom to record the steps you take in your network installation.

· A screen-capture or snipping tool.

· Cisco Packet Tracer 7.2 (or later)
This is available from https://www.netacad.com/courses/packet-tracer.

· USB drive or other storage method with enough free space to save work to.

What will the assessor provide?

· Access to the Learning Management System.

· ICTSAS307_AE_SR1.zip, which contains the following files:

· PlanetG3 Project scenario — PlanetG3_Project_Scenario.pdf

· XYZ Network — XYZ_Network_Installation_Plan_Template.docx

· PlanetG3 Network simulation file
PlanetG3_NetSim_PT.pka

· Video recording instructions (pdf).

Please note there may be other files in ICTSAS307_AE_SR1.zip. These are not related to this assessment.

Supervision

Your assessor may ask for additional evidence to verify the authenticity of your submission and confirm that the assessment task was completed by you.

Reasonable adjustment

If you have a permanent or temporary condition that may prevent you from successfully completing the assessment event(s) in the way described, you should talk to your assessor about ‘reasonable adjustment’. This is the adjustment of the way you are assessed to take into account your condition, which must be approved before you attempt the assessment.

Assessment feedback, review or appeals

Appeals are addressed in accordance with Every Student’s Guide to Assessment in TAFE NSW.

Specific task instructions

The instructions and the criteria in the tasks and activities below will be used by the assessor to determine whether the tasks and activities have been satisfactorily completed. Use these instructions and criteria to ensure you demonstrate the required skills and knowledge.

These practicals will need to be recorded using video (or screenshots) and submitted as evidence. For video recordings, follow the Video recording instructions (pdf).

Your responses will be used as part of the overall evidence requirements of the unit.

Once completed you will need to submit this assessment and the tasks and activities you are required to complete to your assessor for marking.

Case study scenario – PlanetG3

PlanetG3 is a small start-up company located in Sydney. They currently have eight employees and are planning to expand their office premises in the near future. PlanetG3 has consulted with your company XYZ Networking Services to setup their small office network.

As the network engineer at XYZ Networking Services, you are given the task of planning and designing the small office network for your client. You will be reporting to your project manager at XYZ Networking Services, Mark Myers (Email: markmyers@xyz.com , Phone: 0415987563)

Your client contact is Jason Brown (PlanetG3 Manager: Phone: 0415875988, Email: jbrown@gmail.com)

Continue reading this PlanetG3 case study scenario in document PlanetG3 Project scenario (PlanetG3_Project_Scenario.pdf). This document is in ICTSAS307_AE_SR1.zip.

Scenario –PlanetG3 network installation, configure, test and secure

Your proposed PlanetG3 network implementation plan has been approved by your client PlanetG3. You now need to complete for the network installation, configure, test and secure.

Part 1: Install network

Section 1. Prepare network environment

In this section you will be creating your network environment in Cisco Packet Tracer and establishing your physical environment in the PlanetG3 premises.

Step 1.1: Load the network configuration files

  1. Open PlanetG3 Network simulation file (PlanetG3_NetSim_PT.pka) with Cisco packet tracer to implement the network. This file is in ICTSAS307_AEzip.
  2. Save your file as PlanetG3_NetSim_PT_yourname.pka where yourname is your full name.

Step 1.2: Establish physical environment

To establish your physical environment, do the following:

  • Click on the Physical tab in the simulation file.
  • Navigate to the following physical location: Sydney NSW 2000.
  • Go inside the building: No 10, Beverly Street, PlanetG3 Office.

This now establishes your physical network in the simulated PlanetG3 office premises.

Make sure that you regularly save your file so that you do not lose any of your work.

Section 2. Install network

In this section you will be installing computer and other hardware, according to network design and industry standards, using your knowledge of relevant installation and configuration tools.

For this step you need to refer to your previously prepared PlanetG3 Network design.

Step 1.3: Install network

To install the network, do the following;

  1. Move the switch, server and backup device into the PlanetG3 server room closet.
  2. Connect devices in the network, using your selected cable types, according to your PlanetG3 Network Design.
  3. Click on the Logical tab in the simulation file
  4. Name and label all devices according to your PlanetG3 Network design.
  5. Connect the wireless router (WRT300N) it to the internet connection through the DSL modem provided by the ISP

Hint: You can create bend points on the cables by just clicking on the cable and choosing Create BendPoint.

Take a video recording (or screenshots) of the above steps and paste them in the following table.

Note:

  • If taking screenshots use a tool such as SnipIT to take a screenshot of only the part of the screen required.
  • If the activity is video-recorded, upload the video to a share service and paste the share link in the table below. Follow the Video recording instructions (pdf).

Part 2: Configure network

In this step you will be configuring computer and other hardware according to network design and industry standards, using your knowledge of relevant installation and configuration tools.

For this step you need to refer to your previously prepared PlanetG3 Network design.

Step 2.1: Configure network

Configure the network according to following settings provided in the Network configuration table. These are based on your PlanetG3 Network design.

Table 2 Network configuration

Device

Configuration requirements

Wireless Router

· DHCP

· Security – SSID: PlanetG3-Wifi, Mode: WAP2, Encryption: AES, SSID: Disabled

Workstations

· Automatic IP addresses within desired IP address range

Wireless Devices (Laptops and Tablets)

· Automatic IP addresses within desired IP address range

Server

· Static IP addresses according to planned IP address scheme

· Host PlanetG3 intranet website. The website should have the title “Welcome to PlanetG3 Intranet Site

· File sharing enabled

· Email services enabled

Backup

· Static IP addresses according to planned IP address scheme

Printer

· Static IP addresses according to planned IP address scheme

Take a video recording or, if you taking screenshots of the above steps and paste them in the following table.

Note:

  • If taking screenshots use a tool such as SnipIT to take a screenshot of only the part of the screen required.
  • If the activity is video-recorded, upload the video to a share service and paste the share link in the table below. Follow the Video recording instructions (pdf).

Part 3: Test network

In these sections you will be troubleshooting client-side connectivity in your network using appropriate networking settings to review relevant network tools. You will need to test network settings to ensure the network is functioning according to specification. You will also need to resolve problems identified in the testing process.

For these steps you need to refer to your previously prepared PlanetG3 Network design.

Section 1. Troubleshoot client-side wired connectivity

Step 3.1: Test wired connectivity

Use the ping command to test wired connectivity between connected network devices according to the requirements in your PlanetG3 Network design.

This testing will include the following connections:

  • Each workstations to the server
  • Each workstations to the printer

Use the following table to methodically verify and document connectivity between each network device. Add rows to the table as required.

Table 3 Wired network devices connectivity tests

From device

To device

IP Address

Ping results

Step 3.2: Record the troubleshooting process and configuration changes

Take corrective action to establish wired connectivity if a test fails. Record this in the troubleshooting log below.

Use this log to document your actions and results during the troubleshooting process. List the steps you took to gather information and, as you progress, record your thoughts as to what you think the problem might be and what actions you took to correct the problems. You may also provide evidence by using screenshots. Add rows to the table as required.

Table 4 Troubleshooting log

Device

Problem, actions and results

Section 2. Troubleshoot client-side wireless connectivity

Step 3.3: Test wireless connectivity

Use the ping command to test wireless connectivity between connected network devices according to the requirements in your PlanetG3 Network design.

This testing will include the following connections:

  • Each wireless device (laptops and tablets) to the server
  • Each wireless device (laptops and tablets) to the printer

Use the following table to methodically verify and document connectivity between each network device. Add rows to the table as required.

Table 5 Wireless network devices connectivity tests

From device

To device

IP Address

Ping results

Step 3.4: Record the troubleshooting process and configuration changes

Take corrective action to establish wireless connectivity if a test fails. Record this in the Troubleshooting Log below.

Use this log to document your actions and results during the troubleshooting process. List the steps you took to gather information and, as you progress, record your thoughts as to what you think the problem might be and what actions you took to correct the problems. You may also provide evidence by using screenshots. Add rows to the table as required.

Table 6 Troubleshooting log

Device

Problem, actions and results

In the following sections you will be testing installed software and hardware using available networking tools to ensure components function as expected. The software you are testing is the web browser.

Section 3. Test installed software

Step 3.5: Test intranet access

Ensure that each devices can connect to the PlanetG3 intranet by typing http://planetg3.local in the browser. This testing will include the following devices:

  • Each wired workstations
  • Each wireless devices, including laptops and tables.

Use the following table to methodically verify and document access to the PlanetG3 intranet by each network device. Include a scaled-down screenshot confirming the access was successful. Add rows to the table as required.

Table 7 Intranet access tests

Device

Result

Step 3.6: Record the troubleshooting process and configuration changes

Take corrective action to establish intranet access if a test fails. Record this in the troubleshooting log below.

Use this log to document your actions and results during the troubleshooting process. List the steps you took to gather information and, as you progress, record your thoughts as to what you think the problem might be and what actions you took to correct the problems. You may also provide evidence by using screenshots. Add rows to the table as required.

Table 8 Troubleshooting log

Device

Problem, actions and results

Step 3.7: Test internet access

Ensure that each devices can connect to the internet by typing http://www.google.com in the browser. This testing will include the following devices:

  • Each wired workstations
  • Each wireless devices, including laptops and tables.

Use the following table to methodically verify and document access to the internet by each network device. Include a scaled-down screenshot confirming the access was successful. Add rows to the table as required.

Table 9 Internet access tests

Device

Result

Step 3.8: Record the troubleshooting process and configuration changes

Take corrective action to establish internet access if a test fails. Record this in the troubleshooting log below.

Use this log to document your actions and results during the troubleshooting process. List the steps you took to gather information and, as you progress, record your thoughts as to what you think the problem might be and what actions you took to correct the problems. You may also provide evidence by using screenshots. Add rows to the table as required.

Table 4 Troubleshooting log

Device

Problem, actions and results

Part 4: Secure network

Step 4.1: Apply security features

In this step you will be applying specific protection using identified security features to protect against possible network attacks.

For this step you need to refer to your previously prepared PlanetG3 Network design.

Configure the wireless router to use beacon broadcasting, secured connection mode and encryption as follows:

Table 11 Network configuration

Device

Configuration requirements

Wireless Router

· SSID: PlanetG3-Wifi

· SSID: Disabled

· Mode: WAP2

· Encryption: AES

Take a video recording (or screenshots) of the above steps and paste them in the following table.

Note:

  • If taking screenshots use a tool such as SnipIT to take a screenshot of only the part of the screen required.
  • If the activity is video-recorded, upload the video to a share service and paste the share link in the table below. Follow the Video recording instructions (pdf).

Step 4.2 Troubleshoot security intrusion

In this step you will troubleshoot different types of security intrusion symptoms and issues in your network.

Scenario

It has been noted that there is a security risk associated with the FTP service on the server in the PlanetG3 network. Users are able to quickly work out how to log onto the FTP service and are then able to delete, modify, add and rename files.

This has caused great concern to PlanetG3 management as FTP is only supposed to be used to access and read archived files on the server. They believe this is a security risk as files could be lost or incorrectly modified.

They have asked that you investigate and update the FTP account settings on the server to eliminate or reduce the security risk.

Trouble shoot this problem on the PlanetG3 network and update the FTP service settings on the server to eliminate this risk.

Include screenshots and brief descriptions to provide evidence of your work in the table below.

Step 4.3 Security concepts and technology

In this step you will identify possible security concepts and technologies relevant to securing the network.

In the previous two steps (4.1 and 4.2), you used technology (router and server settings) to secure the network from possible network attacks.

Identify two specific technology setting changes that were made in any of the previous two steps. For each of these technology setting changes explain the relevant security concepts behind the change.

Use the following table for your answer. (Approx. 50 words)

Table 7 Security concepts and technology

Technology setting change

Security concept

Assessment checklist

The following checklist will be used by your assessor to mark your performance against the assessment criteria of your submitted packet tracer file. Use this checklist to understand what skills and/or knowledge you need to demonstrate in your submission. All the criteria described in the Assessment checklist must be met. The assessor may ask questions after the task has been submitted.

Table 12 Assessment checklist

STEP #

Instructions

S

U/S

Assessor comments

5.1.

Install and configure computer and other hardware according to network design and industry standards, using knowledge of relevant installation and configuration tools

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.2.

Troubleshoot client-side connectivity using appropriate networking settings to review relevant network tools

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.3.

Test installed software and hardware, using available networking tools to ensure components function as expected

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.4.

Test network settings to ensure network is functioning according to specification

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.5.

Resolve problems identified in testing process

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.6.

Apply specific protection using identified security features to protect against possible network attacks

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.7.

Troubleshoot different types of security intrusion symptoms and issues

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.8.

Makes decisions quickly and intuitively in familiar situations requiring immediate attention, drawing on past experience to identify key variables, consider possible implications of different courses of action and determine the best course of action

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.9.

Uses systematic, analytical processes in configuration and testing of network, setting goals, gathering relevant information, and identifying and evaluating options against agreed criteria

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.10.

Applies formal problem-solving processes when resolving network problems and troubleshooting symptoms and issues, breaking complex issues into manageable parts and identifying and evaluating several options for action

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.11.

Understands key principles and concepts that underpin the operation of digital systems and tools

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.12.

Install, configure and test the network according to client requirements

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.13.

Identify possible security threats and secure the network.

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

5.14.

Able to work in an environment that is safe and replicates the workplace where noise levels, production flow, interruptions and time variances are typical of those experienced in the systems administration and support field of work.

Assessors are to record their assessment in sufficient detail to demonstrate their judgement of the student’s performance against the criteria.

Diploma Universities Assignments

Laureate International Universities Assignment

Holmes Institute Assignment

Tafe NSW

Yes College Australia

ACC508 Informatics and Financial Applications Task 2 T2, 2019

ACC512 Accounting

ACC520 Legal Regulation of Business Structures Semester 2, 2019

ACCT20074 Contemporary Accounting Theory Term 2 Assessment 3

AERO2463 Computational Engineering Analysis : Assignment 4

B01DBFN212 Database Fundamentals Assessment 1

BE01106 - Business Statistics Assignment

BFA301 Advanced Financial Accounting

BFA504 Accounting Systems Assessment 3

BSB61015 Advanced Diploma of Leadership and Management

BSBADV602 Develop an Advertising Campaign

BSBCOM603 Plan and establish compliance management systems case study

BSBCOM603 Plan and establish compliance management systems Assessment Task 1

BSBCOM603 Plan and establish compliance management systems Assessment Task 2

BSBCOM603 Plan and establish compliance management systems Assessment Task 3

BSBFIM501 Manage Budgets And Financial Plans Assessment Task 1

BSBHRM602 Manage Human Resources Strategic Planning

BSBINM601 Manage Knowledge and Information

BSBWOR501 Assessment Task 3 Plan Personal Development Plan Project

BSBMGT517 Manage Operational Plan

BSBWHS521 Ensure a Safe Workplace For a Work Area

BSBWRK510 Manage employee relations

BUSS1030 Accounting, Business and Society

CAB202 Microprocessors and Digital Systems Assignment Help

CHC40213 Certificate IV in Education Support

CHCAGE001 Facilitate the empowerment of older people

CHCAGE005 Provide support to people living with dementia

CHCCCS023 Support independence and wellbeing

CHCCCS025 Support relationships with carers and families

CHCCOM005 Communicate and CHCLEG001 Work Legally Ethically

CHCDIS002 Follow established person-centred behaviour supports

CHCECE019 Early Childhood Education and Care

CHCHCS001 Provide home and community support services

COMP10002 Foundations of Algorithms

COMP90038 Algorithms and Complexity

COSC2633/2637 Big Data Processing

COSC473 Introduction to Computer Systems

CPCCBC5011A Manage Environmental Management Practices And Processes In Building And Construction

CPCCBC5018A Apply structural Principles Medium rise Construction

CSE3OSA Assignment 2019

ELEC242 2019 Session 2

ENN543 Data Analytics and Optimisation

ENN543 Data Analytics and Optimisation Semester 2, 2019

FINM202 Financial Management Assessment 3 Group Report

Forensic Investigation Case Assignment ECU University

HA2042 Accounting Information Systems T2 2019

HC1010 Holmes Institute Accounting For Business

HC2112 Service Marketing and Relationship Marketing Individual Assignment T2 2019

HC2121 Comparative Business Ethics & Social Responsibility T2 2019

HI5002 Holmes Institute Finance for Business

HI5003 Economics for Business Trimester 2 2019

HI5004 Marketing Management T1 2020 Individual Report

HI5004 Marketing Management T1 2020 Group Report

HI5004 Holmes Institute Marketing Management

HI5014 International Business across Borders Assignment 1

HI5014 International Business across Borders

HI5017 Managerial Accounting T2 2019

HI5017 Managerial Accounting T1 2019

HI5019 Tutorial Questions 1

HI5019 Strategic Information Systems for Business and Enterprise T1 2020

HI5019 Holmes Institute Strategic Information Systems T2

HI5019 T2 2019

HI5019 T1 2019

HI5020 Corporate Accounting T3 2019

HI5020 Corporate Accounting T2 2019

HI6005: Management and Organisations in a Global Environment

HI6006 Tutorial questions

HI6006 Competitive Strategy Individual T1 2020

HI6006 Holmes Institute Competitive Strategy

HI6006 Competitive Strategy T3 2019

HI6007 Statistics for business decisions

HI6007 Assessment 2 T1 2020

HI6007 T1 2019

HI6008 T2 2019

HI6008 Holmes Institute Research Project

HI6025 Accounting Theory and Current Issues

HI6026 Audit, Assurance and Compliance Assignment Help

HI6026 Audit, Assurance and Compliance

HI6027 business and corporate law tutorial Assignment T1 2021

HI6027 Business and Corporate Law T3 2019

HI6027 Business and Corporate Law T2 2019

HI6028 Taxation Theory, Practice and Law T2 2021

Hi6028 taxation theory, practice and law Final Assessment t1 2021

HI6028 Taxation Theory, Practice and Law T2 2019

HI6028 Taxation Theory T1 2019

HI6028 Taxation Law Holmes

HLTAAP001 Recognise healthy body systems

HLTWHS002 Follow safe practices for direct client care

HOTL5003 Hotel Property and Operations

HPS771 - Research Methods in Psychology A

HS2021 Database Design

ICTICT307 Customise packaged software applications for clients

IFN619 Data Analytics for Strategic Decision Makers

INF80028 Business Process Management Swinburne University

ISY2005 Case Assignment Assessment 2

ISYS326: Information Systems Security Assignment 2, Semester 2, 2019

ITAP3010 Developing Data Access Solutions Project

ITECH1103- Big Data and Analytics – Lab 3 – Working with Data Items

ITECH1103- Big Data and Analytics Assignment Semester 1, 2020

ITECH 5500 Professional Research and Communication

Kent Institute Australia Assignment

MA5830 Data Visualisation Assignment 2

MGMT7020 Project Management Plan

Mgt 301 Assessment 3

MGT215 Project Management Individual Assignment

MIS102 Data and Networking Assignment Help

MITS4002 Object Oriented Software Development

MITS5002 Software Engineering Methodology

MKT01760 Tourism Planning Environments Assessment 4

MKT01760 Tourism Planning Environments

MKT01906 International Tourism Systems

MKT5000 Marketing Management S2 2019

MNG03236 Report Writing SCU

MRE5003 Industrial Techniques In Maintenance Management Assignment 4

MRE5003 Industrial Techniques In Maintenance Management Assignment 3

MRE5003 Industrial Techniques In Maintenance Management

Network Security and Mitigation Strategies Answers

NIT2213 Software Engineering Assignment

NSB231 Integrated Nursing Practice Assessment Task 1

Science Literacy Assessment 4

SIT323 Practical Software Development T 2, 2019

SIT718 Using aggregation functions for data analysis

SITXCOM002 Show Social and Cultural Sensitivity

TLIL5055 Manage a supply chain

TLIR5014 Manage Suppliers

USQ ACC5502 Accounting and Financial Management

UTS: 48370 Road and Transport Engineering Assessment 2

CHCAGE001 Facilitate the empowerment of older people

CHCAGE005 Provide support to people living with dementia

CHCCCS011 Meet personal support needs

CHCCCS015 Provide Individualised Support

CHCCCS023 Support independence and wellbeing

CHCCCS025 Support relationships with carers and families

CHCCOM005 Communicate and work in health or community services

CHCDIS001 Contribute to ongoing skills development

CHCDIS002 Follow established person-centred behaviour supports

CHCDIS003 Support community participation and social inclusion

CHCDIS005 Develop and provide person-centred service responses

CHCDIS007 Facilitate the empowerment of people with disability

CHCDIS008 Facilitate community participation and social inclusion

CHCDIS009 Facilitate ongoing skills development

CHCDIS010 Provide person-centred services

CHCDIV001 Work with diverse people

CHCHCS001 Provide home and community support services

CHCLEG001 Work legally and ethically

CHCLEG003 Manage legal and ethical compliance

HLTAAP001 Recognise healthy body systems

HLTAID003 Provide First Aid

HLTHPS007 Administer and monitor medications

HLTWHS002 Follow safe work practices for direct client care

Assignment 2 Introduction to Digital Forensics

MGT603 Systems Thinking Assessment 1

MGT603 Systems Thinking Assessment 2

Hi5017 Managerial Accounting T1 2021

HI6028 Taxation Theory, Practice and Law T1 2021

OODP101 Assessment Task 3 T1 2021

ITNE2003R Network Configuration and Management Project

Australia Universities

ACT

Australian Catholic University

Australian National University

Bond University

Central Queensland University

Charles Darwin University

Charles Sturt University

Curtin University of Technology

Deakin University

Edith Cowan University

Flinders University

Griffith University

Holmes Institute

James Cook University

La Trobe University

Macquarie University

Monash University

Murdoch University

Queensland University of Technology

RMIT University

Southern Cross University

Swinburne University of Technology

University of Adelaide

University of Ballarat

University of Canberra

University of Melbourne

University of Newcastle

University of New England

University of New South Wales

University of Notre Dame Australia

University of Queensland

University of South Australia

University of Southern Queensland

University of Sydney

University of Tasmania

University of Technology Sydney

University of the Sunshine Coast

University of Western Australia

University of Wollongong

Victoria University

Western Sydney University

Year 11 - 12 Certification Assignment

Australian Capital Territory Year 12 Certificate

HSC - Higher School Certificate

NTCE - Northern Territory Certificate of Education

QCE - Queensland Certificate of Education

SACE - South Australian Certificate of Education

TCE - Tasmanian Certificate of Education

VCE - Victorian Certificate of Education

WACE - Western Australia Certificate of Education

citation generator
citaion generator
make money online