CPCCBC5011A Manage Environmental Management Practices And Processes In Building And Construction | Australian University Assignment
Assessment Task: 2
Assessment Title: Develop and Implement an Environmental Management Plan
Student Version: Report, Project, Portfolio
Student information | |||
Student name: |
Student ID: |
Section A – Program/Course details | |||
Qualification code: |
CPC50210 |
Qualification title: |
Building And Construction |
Unit code: |
CPCCBC5011A CPC 50097 |
Unit title: |
Manage Environmental Management Practices And Processes In Building And Construction |
Section B – Assessment task details | |||
Assessment number: |
1 |
Semester/Year: |
201920 |
Assessment task results: |
This assessment task will be marked as: | ||
Ungraded result: Satisfactory or Not Satisfactory Other (eg points): Graded |
Section C – Instructions to students |
Task instructions: |
You are to identify an old brewery in Collingwood. The Yorkshire brewery (14-21 Robert street Collingwood). Your task is to demolish and clean the site in preparation for the development of a high rise apartment block, while retaining the heritage buildings on the site. The site has various heritage buildings on the site which need to be decontaminated, cleaned of all graffiti and retained. Your company has been awarded the task of providing a report on the management of the environmental practices that should be put in place. Your report should include but not be restricted to the following: Part 1.
Part 2. With the information gathered, develop an environmental management plan, based upon the ISO14000 series or Environmental Guidelines for Major Construction Sites by EPA Victoria Publications |
Section D – Conditions for assessment | |
Conditions: | |
General instructions:
| |
Equipment/resources students must supply: |
Equipment/resources to be provided by the RTO: |
|
|
Section E – Marking Guide | |||
Assessment number: |
2 |
Assessment title: |
Develop and implement an environmental management plan |
Student ID: |
ID. |
Student name: |
Student name. |
Unit code: |
CPCCBC5011A |
Unit title: |
Manage Environmental Management Practices And Processes In Building And Construction |
Date: |
Click here to enter a date. |
Criteria for assessment |
Satisfactory |
Comment | ||
Yes |
No | |||
The following has been submitted for assessment: | ||||
Students should use the template as a guide on how the report is to be formatted for this unit of study. At a minimum the following should be included in the report.
|
☐ |
☐ |
Click here to enter text. | |
Upload the CRS176 form as a separate document onto Brightspace, THIS IS MANDATORY. |
☐ |
☐ |
Click here to enter text. | |
Marking criteria for each product document/s supplied. | ||||
1. |
Company policy |
☐ |
☐ |
Click here to enter text. |
2. |
Stakeholders |
☐ |
☐ |
Click here to enter text. |
3. |
Possible environmental issues |
☐ |
☐ |
Click here to enter text. |
4. |
Statutory Requirement |
☐ |
☐ |
Click here to enter text. |
5. |
Pre-construction planning and design |
☐ |
☐ |
Click here to enter text. |
6. |
Environmental assessment |
☐ |
☐ |
Click here to enter text. |
7. |
Risk |
☐ |
☐ |
Click here to enter text. |
8. |
Environment management plan |
☐ |
☐ |
Click here to enter text. |
9. |
Land disturbance |
☐ |
☐ |
Click here to enter text. |
10. |
Erosion |
☐ |
☐ |
Click here to enter text. |
11. |
Management of contaminated stormwater |
☐ |
☐ |
Click here to enter text. |
12. |
Designing erosion and sediment control devices |
☐ |
☐ |
Click here to enter text. |
13. |
De-watering work sites |
☐ |
☐ |
Click here to enter text. |
14. |
Dust control |
☐ |
☐ |
Click here to enter text. |
15. |
Management of stockpiles and batters |
☐ |
☐ |
Click here to enter text. |
16. |
Noise and vibration |
☐ |
☐ |
Click here to enter text. |
17. |
Operating hours |
☐ |
☐ |
Click here to enter text. |
18. |
Vehicles and equipment |
☐ |
☐ |
Click here to enter text. |
19. |
Traffic |
☐ |
☐ |
Click here to enter text. |
20. |
Vibration |
☐ |
☐ |
Click here to enter text. |
21. |
Waste minimisation |
☐ |
☐ |
Click here to enter text. |
22. |
Contaminated material and wastes |
☐ |
☐ |
Click here to enter text. |
23. |
Solid inert wastes |
☐ |
☐ |
Click here to enter text. |
24. |
Putrescible wastes |
☐ |
☐ |
Click here to enter text. |
25. |
Low-level contaminated soil |
☐ |
☐ |
Click here to enter text. |
26. |
Prescribed wastes |
☐ |
☐ |
Click here to enter text. |
27. |
Emergency procedures |
☐ |
☐ |
Click here to enter text. |
28. |
Air quality |
☐ |
☐ |
Click here to enter text. |
29. |
Litter |
☐ |
☐ |
Click here to enter text. |
30. |
Storage of chemicals and fuel |
☐ |
☐ |
Click here to enter text. |
31. |
Road cleaning |
☐ |
☐ |
Click here to enter text. |
32. |
Protecting infrastructure |
☐ |
☐ |
Click here to enter text. |
33. |
Inspections, monitoring and audits |
☐ |
☐ |
Click here to enter text. |
34. |
Content and length indicates appropriate depth of research and learning: |
☐ |
☐ |
Click here to enter text. |
35. |
Clearly followed instructions set out in Section D – Conditions for assessment. |
☐ |
☐ |
Click here to enter text. |
Section F – Feedback to Student | ||
Has the student successfully completed this assessment task? |
Yes |
No |
☐ |
☐ | |
Additional Assessor comments (as appropriate): |
Resubmission allowed: |
Yes ☐ |
No ☐ |
Resubmission due date: |
Click here to enter a date. |
Assessor name: |
Choose an item. | |||
Assessor signature: |
Choose an item. | |||
Date: |
Click here to enter a date. |